Outdoor Fireplace  

Assembly Instructions and Dimensions

The FLARE Outdoor Fireplace

Please read thoroughly before commencing installation

Council Permits
Some councils require a permit for outdoor fireplaces. For permit submission you will require the following document:
Flare Outdoor Fireplace PS1 (PDF)

Assemble Dimensions
Flare Standard Assemble (PDF) Flare Standard Dimensions (PDF)
Flare Deluxe Assemble (PDF) Flare Deluxe Dimensions (PDF)
Flare Premier Assemble (PDF) Flare Premier Dimensions (PDF)

Warning: Allow at least 48 hrs for Anchor fix to dry before commissioning the fire place.
The first six fires should be small. This allows for the fire bricks and the panels to cure.
Failure to do this could result in fire bricks or panels cracking.

Click to enlarge

 

Congratulations on your successful installation of the FLARE Outdoor Fireplace by Gibraltar Built.

>Home >Installation & Assembly

 
Site by Web Advantage | © 2010 Gibraltar Built